nstallation techniques include drilling up to 30 metres in masonry walls using dry diamond drilling equipment so that the building is
not damaged by water associated with conventional wet drilling. Where possible, suitable trained local contractors are employed to carry out the work.
lastec can be installed in conjunction with other existing or planned security systems to create a multi-layered defence against all
realistic threats.
Typical projects include:
Government buildings
Diplomatic facilities
Military Installations
Ammunition Storage
Key Point protection
Industrial process facilities