blast403

Installation techniques include drilling up to 30 metres in masonry walls using dry diamond drilling equipment so that the building is not damaged by water associated with conventional wet drilling. Where possible, suitable trained local contractors are employed to carry out the work.

Blastec can be installed in conjunction with other existing or planned security systems to create a multi-layered defence against all realistic threats.

Typical projects include:

  • Government buildings
  • Diplomatic facilities
  • Military Installations
  • Ammunition Storage
  • Key Point protection
  • Industrial process facilities

blast406 blast407 blast408